top of page
4678 Isabelle St. • Eugene, OR 97402
Ph: (541) 359-3755 • Fax: (541) 982-2266
CCB# 172839
City of Seal Rock, Oregon
The Automation Group, Inc (TAG) completed a project for The City of Seal Rock. Seal Rock Water District gets their water from The City of Toledo. They upgraded their water delivery and chlorination system to allow for pressure control per grid. TAG installed a new SCADA system with Radio Telemetry to monitor and control all of the booster stations. The city purchased generators to allow for delivery of water under power outages. TAG continues to provide The City of Seal Rock with support services to ensure that the public has safe drinking water
bottom of page