SBSA Chiller Systems Control

SBSA_WWTP_Arial.jpg

 The Automation Group provided a new PLC I/O panel for the South Bayside System Authority.

This new PLC I/O panel handles “Master Control” functions for the chilled water system.

   This project was Bid, Submitted, and Built within 5 weeks of initial contact. Communication protocol needed to be changed midstream during production of the panel per request from the consulting engineering firm.

TAG was able to return the parts in question, acquired the newly specified devices, revise all control drawings, rewire the panel, and still delivery a high quality product within a difficult deadline.