The Albany Diversion Dam was installed to control the height of the river

By using gates operated by air lift systems. A fish screen was also added.

The system is controlled by an Automated SCADA System that is monitored over a

Radio connection at The City.

© Copyright The Automation Group, Inc.. All rights reserved. Shopping Cart Websites -powered by MightyMerchant v4.32